# Doxford Hall Hotel and Spa · Vend Electric

Web page: https://ampmap.co.uk/charger/vend-electric-doxford-hall-hotel-and-spa-uk

Doxford Hall Hotel and Spa is an EV charging site in Ellingham, Northumberland, run by Vend Electric. Both of its sockets are 7 kW Type 2, and the price is listed as 42p.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Doxford Hall Hotel and Spa, NE67 5DN
- **Area:** Ellingham, Northumberland, United Kingdom
- **Coordinates (latitude, longitude):** 55.51106, -1.70639

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** 42p (from Open Charge Map)

## Site information

- **Operator:** Vend Electric
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** ( 1 ) 7kW Chargers ( 2 sockets ) https://app.vendelectric.com/

## Common questions

### How much does it cost to charge at Doxford Hall Hotel and Spa (Vend Electric)?

The listed price is 42p. Prices can change, so check the price at the charger before you start.

### How fast is charging at Doxford Hall Hotel and Spa (Vend Electric)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Doxford Hall Hotel and Spa (Vend Electric) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Doxford Hall Hotel and Spa?

Doxford Hall Hotel and Spa is on the Vend Electric network. For site issues, the operator lists 01665 589700.

### How long does a Tesla Model Y Long Range take to charge at Doxford Hall Hotel and Spa (Vend Electric)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Doxford Hall Hotel and Spa (Vend Electric)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Doxford Hall Hotel and Spa (Vend Electric)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Ellingham](https://ampmap.co.uk/chargers/united-kingdom/northumberland/ellingham)
- [Vend Electric chargers](https://ampmap.co.uk/networks/vend-electric)

## Chargers near this site

- [Sea Lane · EO Charging](https://ampmap.co.uk/charger/eo-charging-sea-lane-uk) - Type 2 22 kW · Sea Lane
- [Beadnell Bay Car Park · evcharge.online](https://ampmap.co.uk/charger/evcharge-online-beadnell-bay-car-park-uk) - Type 2 7 kW · Beadnell

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/vend-electric-doxford-hall-hotel-and-spa-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 10 Jun 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
