# Galson Trust Urras Office · Vend Electric

Web page: https://ampmap.co.uk/charger/vend-electric-galson-trust-urras-office-uk

Galson Trust Urras Office is an EV charging site in Isle of Lewis, Eilean Siar, run by Vend Electric. Both of its sockets are 22 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Tom na Ba, HS2 0SH
- **Area:** Isle of Lewis, Eilean Siar, United Kingdom
- **Coordinates (latitude, longitude):** 58.43722, -6.39032

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Vend Electric
- **Opening hours:** Not published
- **Access:** Customers only

## Common questions

### How much does it cost to charge at Galson Trust Urras Office (Vend Electric)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Galson Trust Urras Office (Vend Electric)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Galson Trust Urras Office (Vend Electric) have?

2 charging sockets: 2 × 22 kW Type 2.

### Who operates Galson Trust Urras Office?

Galson Trust Urras Office is on the Vend Electric network.

### Can anyone charge at Galson Trust Urras Office (Vend Electric)?

The operator lists this charger for customers of the site.

### How long does a Tesla Model Y Long Range take to charge at Galson Trust Urras Office (Vend Electric)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Galson Trust Urras Office (Vend Electric)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Galson Trust Urras Office (Vend Electric)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Isle of Lewis](https://ampmap.co.uk/chargers/united-kingdom/eilean-siar/isle-of-lewis)
- [Vend Electric chargers](https://ampmap.co.uk/networks/vend-electric)

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/vend-electric-galson-trust-urras-office-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 22 May 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
