# Haven The Orchards Holiday Park · Vend Electric

Web page: https://ampmap.co.uk/charger/vend-electric-haven-the-orchards-holiday-park-uk

Haven The Orchards Holiday Park is an EV charging site in Clacton-on-Sea, Essex, run by Vend Electric. Both of its sockets are 11 kW Type 2, and the price is listed as £0.50/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Point Clear Clacton on Sea, CO16 8LJ
- **Area:** Clacton-on-Sea, Essex, United Kingdom
- **Coordinates (latitude, longitude):** 51.79797, 1.03206

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 11 kW | 7 | Not listed |

- **Price:** £0.50/kWh (from Open Charge Map)

## Site information

- **Operator:** Vend Electric
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** Good Condition all LEDS working

## Common questions

### How much does it cost to charge at Haven The Orchards Holiday Park (Vend Electric)?

The listed price is £0.50/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Haven The Orchards Holiday Park (Vend Electric)?

Up to 11 kW AC via Type 2.

### How many charging sockets does Haven The Orchards Holiday Park (Vend Electric) have?

2 charging sockets: 4 × 11 kW Type 2, 1 × 11 kW Type 2, 1 × 11 kW Type 2, 1 × 11 kW Type 2.

### Who operates Haven The Orchards Holiday Park?

Haven The Orchards Holiday Park is on the Vend Electric network. For site issues, the operator lists 01205 724754.

### How long does a Tesla Model Y Long Range take to charge at Haven The Orchards Holiday Park (Vend Electric)?

A 10–80% charge takes about 5h 2m on the 11 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Haven The Orchards Holiday Park (Vend Electric)?

A 10–80% charge takes about 3h 38m on the 11 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Haven The Orchards Holiday Park (Vend Electric)?

A 10–80% charge takes about 4h 39m on the 11 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Clacton-on-Sea](https://ampmap.co.uk/chargers/united-kingdom/essex/clacton-on-sea)
- [Vend Electric chargers](https://ampmap.co.uk/networks/vend-electric)

## Chargers near this site

- [Karan Pumphill Garage · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-karan-pumphill-garage-uk) - CCS 400 kW · B1027, Clacton Rd

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/vend-electric-haven-the-orchards-holiday-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 30 Jan 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.