Vend Electric · EV charging site
Hilton at St George's Park
B5234, Burton upon Trent, DE13 9PD
Hilton at St George's Park is an EV charging site in Burton upon Trent, Staffordshire, run by Vend Electric. All 10 of its sockets are 7 kW Type 2, and the price is listed as £0.50/kWh. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Punch Pubs & Co, Burton upon Trent (Osprey Charging), 3.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Vend Electric
- Opening hours
- Not published
- Access
- Public
- Price
- £0.50/kWh(from Open Charge Map, 9 Oct 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Hilton at St George's Park (Vend Electric)?
The listed price is £0.50/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Hilton at St George's Park (Vend Electric)?
Up to 7 kW AC via Type 2.
How many charging sockets does Hilton at St George's Park (Vend Electric) have?
10 charging sockets: 10 × 7 kW Type 2.
Who operates Hilton at St George's Park?
Hilton at St George's Park is on the Vend Electric network.
Where is the nearest charger with 50 kW or more to Hilton at St George's Park (Vend Electric)?
Punch Pubs & Co, Burton upon Trent (Osprey Charging) is 3.7 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hilton at St George's Park (Vend Electric)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hilton at St George's Park (Vend Electric)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hilton at St George's Park (Vend Electric)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- The Meynell Ingram Arms · 22 kW · 2 mi