Vend Electric · EV charging site
Huntingdon Crematorium
Mayfield Heath Farm, Huntingdon, PE28 2NX
Huntingdon Crematorium is an EV charging site in Huntingdon, Cambridgeshire, run by Vend Electric. It has a single 22 kW Type 2 socket, and the price is listed as £0.20/kWh. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Extra - Huntingdon, 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Vend Electric
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.20/kWh(from Open Charge Map, 5 Jan 2024)
- Notes
- Gates Closed Weekends
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Huntingdon Crematorium (Vend Electric)?
The listed price is £0.20/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Huntingdon Crematorium (Vend Electric)?
Up to 22 kW AC via Type 2.
How many charging sockets does Huntingdon Crematorium (Vend Electric) have?
1 charging socket: 10 × 22 kW Type 2.
Who operates Huntingdon Crematorium?
Huntingdon Crematorium is on the Vend Electric network.
Where is the nearest charger with 50 kW or more to Huntingdon Crematorium (Vend Electric)?
Pod Point Tesco Extra - Huntingdon is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Huntingdon Crematorium (Vend Electric)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Huntingdon Crematorium (Vend Electric)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Huntingdon Crematorium (Vend Electric)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Extra - Huntingdon
- Pod Point Coneygear Centre
- MFG Huntingdon
- Huntingdon Garden & Home
- Shell Recharge Shell Huntingdon
- Sainsbury's Smart Charge
- Cheapest nearby
- Pod Point Coneygear Centre · 27.6p per kWh · 7 kW · 1.3 mi
- Fastest nearby
- Shell Recharge Shell Huntingdon · 300 kW · 1.9 mi