Vend Electric · EV charging site
Low Wood Bay Hotel & Spa
A591, Kendal, LA23 1LP
Low Wood Bay Hotel & Spa is an EV charging site in Kendal, Cumbria, run by Vend Electric. All 6 of its sockets are 7 kW Type 2, and the price is listed as £0.60/kWh. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Low Fold Car Park (GeniePoint), 1.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Vend Electric
- Opening hours
- Not published
- Access
- Public
- Price
- £0.60/kWh(from Open Charge Map, 6 Sept 2023)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Low Wood Bay Hotel & Spa (Vend Electric)?
The listed price is £0.60/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Low Wood Bay Hotel & Spa (Vend Electric)?
Up to 7 kW AC via Type 2.
How many charging sockets does Low Wood Bay Hotel & Spa (Vend Electric) have?
6 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Low Wood Bay Hotel & Spa?
Low Wood Bay Hotel & Spa is on the Vend Electric network.
Where is the nearest charger with 50 kW or more to Low Wood Bay Hotel & Spa (Vend Electric)?
Low Fold Car Park (GeniePoint) is 1.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Low Wood Bay Hotel & Spa (Vend Electric)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Low Wood Bay Hotel & Spa (Vend Electric)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Low Wood Bay Hotel & Spa (Vend Electric)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Lakeside Car Park - Ambleside
- Hayes Chargers
- Elder Grove
- Low Fold Car Park
- The Ambleside Salutation Hotel & Spa
- Rothay Manor Hotel
- Cheapest nearby
- Pod Point Lakeside Car Park - Ambleside · 58.8p per kWh · 7 kW · 1 mi
- Fastest nearby
- Low Fold Car Park · 50 kW · 1.2 mi