Vend Electric · EV charging site
Mereoak Park & Ride
Mereoak Park & Ride, Lower Earley, RG7 1PB
Mereoak Park & Ride is an EV charging site in Lower Earley, Wokingham, run by Vend Electric. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the price is listed as £0.36/kWh. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge Shell Fairfield, 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Vend Electric
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.36/kWh(from Open Charge Map, 16 Jun 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Mereoak Park & Ride (Vend Electric)?
The listed price is £0.36/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Mereoak Park & Ride (Vend Electric)?
Up to 50 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does Mereoak Park & Ride (Vend Electric) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.
Who operates Mereoak Park & Ride?
Mereoak Park & Ride is on the Vend Electric network.
Where is the nearest other charger with 50 kW or more to Mereoak Park & Ride (Vend Electric)?
Shell Recharge Shell Fairfield is 1 mile away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Mereoak Park & Ride (Vend Electric)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mereoak Park & Ride (Vend Electric)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mereoak Park & Ride (Vend Electric)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Shell Recharge Shell Fairfield
- Ecotricity Green Park Business Park
- Motorline Nissan Reading
- Reading, UK
- Reading FC Stadium
- VOCO Reading
- Cheapest nearby
- Reading, UK · 47p per kWh · 130 kW · 1.2 mi
- Fastest nearby
- Shell Recharge Shell Fairfield · 300 kW · 1 mi