Vend Electric · EV charging site
Sheffield Business Centre
Europa Court, Rotherham, S9 1XZ
Sheffield Business Centre is an EV charging site in Rotherham, run by Vend Electric. It has a single socket, with Type 2 at up to 22 kW, and the price is listed as £0.35/kWh. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Morrisons Rotherham Catcliffe (GeniePoint), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Vend Electric
- Opening hours
- Not published
- Access
- Public
- Price
- £0.35/kWh(from Open Charge Map, 15 Jan 2024)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Sheffield Business Centre (Vend Electric)?
The listed price is £0.35/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Sheffield Business Centre (Vend Electric)?
Up to 22 kW AC via Type 2.
How many charging sockets does Sheffield Business Centre (Vend Electric) have?
1 charging socket: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Sheffield Business Centre?
Sheffield Business Centre is on the Vend Electric network.
Where is the nearest charger with 50 kW or more to Sheffield Business Centre (Vend Electric)?
Morrisons Rotherham Catcliffe (GeniePoint) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Sheffield Business Centre (Vend Electric)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Sheffield Business Centre (Vend Electric)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Sheffield Business Centre (Vend Electric)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Morrisons Rotherham Catcliffe
- ROLLS_ROYCE Rotherham
- Technology Centre Car Park
- Rotherham, UK
- Ring Road Service Station
- EH - IKEA Sheffield
- Cheapest nearby
- Rotherham, UK · 32p per kWh · 250 kW · 1.2 mi
- Fastest nearby
- Rotherham, UK · 250 kW · 1.2 mi