# Fibrus · Weev

Web page: https://ampmap.co.uk/charger/weev-fibrus-uk

Fibrus is an EV charging site in Newtownabbey, Antrim and Newtownabbey, run by Weev. Its 6 sockets reach up to 60 kW, with CCS at the top speed, and the price is listed as See myWeev app.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 104 - 108 Dargan Crescent, BT3 9JP
- **Area:** Newtownabbey, Antrim and Newtownabbey, United Kingdom
- **Coordinates (latitude, longitude):** 54.62975, -5.90831
- **Getting there:** Provided for use outside of business hours - Stricktly 1800 to 0700 weekdays, and all weekends

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 60 kW | 2 | Not listed |
| Type 2 | 11 kW | 2 | Not listed |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** See myWeev app (from Open Charge Map)

## Site information

- **Operator:** Weev
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Fibrus (Weev)?

The listed price is See myWeev app. Prices can change, so check the price at the charger before you start.

### How fast is charging at Fibrus (Weev)?

Up to 60 kW DC via Type 2, CCS.

### How many charging sockets does Fibrus (Weev) have?

6 charging sockets: 2 × 7 kW Type 2, 2 × 60 kW CCS, 2 × 11 kW Type 2.

### Who operates Fibrus?

Fibrus is on the Weev network. For site issues, the operator lists +44 29 9031 3031.

### How long does a Tesla Model Y Long Range take to charge at Fibrus (Weev)?

A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Fibrus (Weev)?

A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Fibrus (Weev)?

A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Newtownabbey](https://ampmap.co.uk/chargers/united-kingdom/antrim-and-newtownabbey/newtownabbey)
- [Weev chargers](https://ampmap.co.uk/networks/weev)

## Chargers near this site

- [DAERA Portal Control](https://ampmap.co.uk/charger/daera-portal-control-2-uk) - Type 2 7 kW · 21 Dargan Dr
- [Lidl Shore Road · EZO (IE)](https://ampmap.co.uk/charger/ezo-lidl-shore-road-uk) - CCS 50 kW, CHAdeMO 50 kW · Shore Road
- [Coastways Storage & Removals · Vend Electric](https://ampmap.co.uk/charger/vend-electric-coastways-storage-and-removals-uk) - Type 2 22 kW · 132 Duncrue St
- [Grove Wellbeing Centre · EZO (IE)](https://ampmap.co.uk/charger/ezo-grove-wellbeing-centre-uk) - CCS 180 kW · York Road
- [Translink · ChargePoint](https://ampmap.co.uk/charger/chargepoint-translink-2-uk) - CCS 142 kW · Duncrue St
- [Jennymount Business Park · Weev](https://ampmap.co.uk/charger/weev-jennymount-business-park-uk) - Type 2 22 kW · North Derby St

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/weev-fibrus-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 22 Apr 2026).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
