Weev · EV charging site
Glenavon House Hotel (2)
52 Drum Road, Cookstown, BT80 8JQ
Glenavon House Hotel (2) is an EV charging site in Cookstown, Mid Ulster, run by Weev. Its 4 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Glenavon House Hotel (1) (Weev), 150 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Weev
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 29 9031 3031
- Getting there
- Glenavon House Hotel, 52 Drum Rd, Cookstown
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Glenavon House Hotel (2) (Weev)?
Up to 50 kW DC via CCS, Type 2, CHAdeMO.
How many charging sockets does Glenavon House Hotel (2) (Weev) have?
4 charging sockets: 1 × 50 kW CCS, 2 × 11 kW Type 2, 1 × 50 kW CHAdeMO.
Who operates Glenavon House Hotel (2)?
Glenavon House Hotel (2) is on the Weev network. For site issues, the operator lists +44 29 9031 3031.
Where is the nearest other charger with 50 kW or more to Glenavon House Hotel (2) (Weev)?
Glenavon House Hotel (1) (Weev) is 150 yards away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Glenavon House Hotel (2) (Weev)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Glenavon House Hotel (2) (Weev)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Glenavon House Hotel (2) (Weev)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Glenavon House Hotel (1)
- Cookstown Leisure Centre
- Country Stoves
- South West College
- Burnavon Theatre
- Lidl Cookstown
- Fastest nearby
- Glenavon House Hotel (1) · 60 kW · 150 yd