Weev · EV charging site
Glór Dhún
Main Street, Dungiven, BT47 4LD
Glór Dhún is an EV charging site in Dungiven, Causeway Coast and Glens, run by Weev. It has a single socket, with CCS and CHAdeMO at up to 120 kW. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Texaco, Glenshane (ESB Ecars), 10 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Weev
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 29 9031 3031
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Glór Dhún (Weev)?
Up to 120 kW DC via CCS, CHAdeMO.
How many charging sockets does Glór Dhún (Weev) have?
1 charging socket: 1 × 120 kW CCS, 1 × 120 kW CHAdeMO.
Who operates Glór Dhún?
Glór Dhún is on the Weev network. For site issues, the operator lists +44 29 9031 3031.
Where is the nearest other charger with 50 kW or more to Glór Dhún (Weev)?
Texaco, Glenshane (ESB Ecars) is 10 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Glór Dhún (Weev)?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Glór Dhún (Weev)?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Glór Dhún (Weev)?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.