# Killyhevlin Lakeside Hotel & Lodges · Weev

Web page: https://ampmap.co.uk/charger/weev-killyhevlin-lakeside-hotel-and-lodges-uk

Killyhevlin Lakeside Hotel & Lodges is an EV charging site in Enniskillen, Fermanagh and Omagh, run by Weev. Its 8 sockets reach up to 60 kW, with CCS at the top speed, and the price is listed as £0.59/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Dublin Road, BT74 6RW
- **Area:** Enniskillen, Fermanagh and Omagh, United Kingdom
- **Coordinates (latitude, longitude):** 54.32888, -7.61848

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 60 kW | 2 | Not listed |
| Type 2 | 11 kW | 6 | Not listed |

- **Price:** £0.59/kWh (from Open Charge Map)

## Site information

- **Operator:** Weev
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Killyhevlin Lakeside Hotel & Lodges (Weev)?

The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Killyhevlin Lakeside Hotel & Lodges (Weev)?

Up to 60 kW DC via CCS, Type 2.

### How many charging sockets does Killyhevlin Lakeside Hotel & Lodges (Weev) have?

8 charging sockets: 2 × 60 kW CCS, 6 × 11 kW Type 2.

### Who operates Killyhevlin Lakeside Hotel & Lodges?

Killyhevlin Lakeside Hotel & Lodges is on the Weev network. For site issues, the operator lists +44 29 9031 3031.

### How long does a Tesla Model Y Long Range take to charge at Killyhevlin Lakeside Hotel & Lodges (Weev)?

A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Killyhevlin Lakeside Hotel & Lodges (Weev)?

A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Killyhevlin Lakeside Hotel & Lodges (Weev)?

A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Enniskillen](https://ampmap.co.uk/chargers/united-kingdom/fermanagh-and-omagh/enniskillen)
- [Weev chargers](https://ampmap.co.uk/networks/weev)

## Chargers near this site

- [Killyhevlin Business Centre · Weev](https://ampmap.co.uk/charger/weev-killyhevlin-business-centre-uk) - CCS 24 kW, Type 2 11 kW · 3 Black Stick Road
- [Belmore Court & Motel · Weev](https://ampmap.co.uk/charger/weev-belmore-court-and-motel-uk) - CCS 120 kW, Type 2 7 kW · Tempo Road
- [Quay Lane North Car Park · ESB Ecars](https://ampmap.co.uk/charger/esb-ecars-quay-lane-north-car-park-uk) - Type 2 22 kW · Quay Lane North
- [Shore Road East Car Park · ESB Ecars](https://ampmap.co.uk/charger/esb-ecars-shore-road-east-car-park-uk) - Type 2 22 kW · Wellington Street
- [Wellington Street](https://ampmap.co.uk/charger/wellington-street-uk) - Enniskillen
- [Enniskilleen Hotel · Fuuse](https://ampmap.co.uk/charger/fuuse-enniskilleen-hotel-uk) - Type 2 22 kW · 72 Forthill Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/weev-killyhevlin-lakeside-hotel-and-lodges-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 28 Apr 2025).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
