Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Weev · EV charging site

Twin Spires Complex

155 Northumberland Street, Belfast, BT13 2JF

Twin Spires Complex is an EV charging site in Belfast, City of Belfast, run by Weev. All 4 of its sockets are 50 kW CCS and CHAdeMO. 18 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is HRL Shankhill (BP Pulse), 0.3 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 17 Oct 2024Last verified 17 Oct 2024

Connectors

CCS · 50 kW2 connectors
CHAdeMO · 50 kW2 connectors

Site information

Operator
Weev
Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)
Phone (from Open Charge Map)
+44 29 9031 3031

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Twin Spires Complex (Weev)?

Up to 50 kW DC via CCS, CHAdeMO.

How many charging sockets does Twin Spires Complex (Weev) have?

4 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO.

Who operates Twin Spires Complex?

Twin Spires Complex is on the Weev network. For site issues, the operator lists +44 29 9031 3031.

Where is the nearest other charger with 50 kW or more to Twin Spires Complex (Weev)?

HRL Shankhill (BP Pulse) is 0.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Twin Spires Complex (Weev)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Twin Spires Complex (Weev)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Twin Spires Complex (Weev)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 17 Oct 2024

Amp Map does not take payment. You pay the operator.