Weev · EV charging site
Ulster Hospital (Graham-Bam Healthcare Partnership)
Upper Newtownards Road, Castlereagh, BT16 1RH
Ulster Hospital (Graham-Bam Healthcare Partnership) is an EV charging site in Castlereagh, City of Belfast, run by Weev. Both of its sockets are 11 kW Type 2. 12 other charging sites are listed within a mile, and the nearest site with 50 kW or more is HRL Hanwood (BP Pulse), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Weev
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 29 9031 3031
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Ulster Hospital (Graham-Bam Healthcare Partnership) (Weev)?
Up to 11 kW AC via Type 2.
How many charging sockets does Ulster Hospital (Graham-Bam Healthcare Partnership) (Weev) have?
2 charging sockets: 2 × 11 kW Type 2.
Who operates Ulster Hospital (Graham-Bam Healthcare Partnership)?
Ulster Hospital (Graham-Bam Healthcare Partnership) is on the Weev network. For site issues, the operator lists +44 29 9031 3031.
Where is the nearest charger with 50 kW or more to Ulster Hospital (Graham-Bam Healthcare Partnership) (Weev)?
HRL Hanwood (BP Pulse) is 0.7 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ulster Hospital (Graham-Bam Healthcare Partnership) (Weev)?
A 10–80% charge takes about 5h 2m on the 11 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ulster Hospital (Graham-Bam Healthcare Partnership) (Weev)?
A 10–80% charge takes about 3h 38m on the 11 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ulster Hospital (Graham-Bam Healthcare Partnership) (Weev)?
A 10–80% charge takes about 4h 39m on the 11 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.