# Wembley Stadium Red Car Park

Web page: https://ampmap.co.uk/charger/wembley-stadium-red-car-park-uk

Wembley Stadium Red Car Park is an EV charging site in Wembley, Greater London. All 15 of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Royal Route, HA9 0RX
- **Area:** Wembley, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.55561, -0.28355
- **Getting there:** Enter from the South Way or Royal Route entrance and the charge points are in most bays on levels 1 and 2. Unfortunately anyone can park in the bays and they are often occupied by ICE vehicles. Not all of the points work, so look for the flashing green light to show it is ready. At present, you don't need to be a member of a charging provider.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 15 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Opening hours:** Not published
- **Access:** Public
- **Notes:** The instruction sign says to use the main panel on each floor to start the charge. This system isn't fully working yet, as long as the green light on the the chargepoint is flashing you can plug in and start charging.

## Common questions

### How much does it cost to charge at Wembley Stadium Red Car Park?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Wembley Stadium Red Car Park?

Up to 7 kW AC via Type 2.

### How many charging sockets does Wembley Stadium Red Car Park have?

15 charging sockets: 15 × 7 kW Type 2.

### How long does a Tesla Model Y Long Range take to charge at Wembley Stadium Red Car Park?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wembley Stadium Red Car Park?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Wembley Stadium Red Car Park?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Wembley](https://ampmap.co.uk/chargers/united-kingdom/greater-london/wembley)
- [Cheapest charging in Wembley](https://ampmap.co.uk/chargers/united-kingdom/greater-london/wembley/cheapest)

## Chargers near this site

- [1 Dagmar Avenue · Char.gy](https://ampmap.co.uk/charger/char-gy-1-dagmar-avenue-uk) - Type 2 5 kW · 1 Dagmar Avenue
- [7 Dagmar Avenue · Char.gy](https://ampmap.co.uk/charger/char-gy-7-dagmar-avenue-uk) - Type 2 5 kW · 7 Dagmar Avenue
- [17 Dagmar Avenue · Char.gy](https://ampmap.co.uk/charger/char-gy-17-dagmar-avenue-uk) - Type 2 5 kW · 17 Dagmar Avenue
- [27 Dagmar Avenue · Char.gy](https://ampmap.co.uk/charger/char-gy-27-dagmar-avenue-uk) - Type 2 5 kW · 27 Dagmar Avenue
- [37 Dagmar Avenue · Char.gy](https://ampmap.co.uk/charger/char-gy-37-dagmar-avenue-uk) - Type 2 5 kW · 37 Dagmar Avenue
- [45 Dagmar Avenue · Char.gy](https://ampmap.co.uk/charger/char-gy-45-dagmar-avenue-uk) - Type 2 5 kW · 45 Dagmar Avenue

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/wembley-stadium-red-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 1 Jun 2016).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
