Wenea · EV charging site
Mill Street Car Park
Mill Street, Kington, HR5 3DP
Mill Street Car Park is an EV charging site in Kington, Herefordshire, run by Wenea. Both of its sockets are 7 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Whitney Village Road (InstaVolt Ltd), 6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Wenea
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Getting there
- LHS of car park near disabled bays. Parking fees apply. In long stay car park. No eligibility restrictions. Length of stay = long stay (7 days a week). Free parking for 30 minutes for electric vehicles whilst recharging.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Mill Street Car Park (Wenea)?
Up to 7 kW AC via Type 2.
How many charging sockets does Mill Street Car Park (Wenea) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Mill Street Car Park?
Mill Street Car Park is on the Wenea network.
Where is the nearest charger with 50 kW or more to Mill Street Car Park (Wenea)?
Whitney Village Road (InstaVolt Ltd) is 6 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Mill Street Car Park (Wenea)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mill Street Car Park (Wenea)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mill Street Car Park (Wenea)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.