Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Wenea · EV charging site

UK_EX_BELMONT_01

Belmont Road, Exeter, EX1 2HG

UK_EX_BELMONT_01 is an EV charging site at Belmont Road in Exeter, Devon, run by Wenea. It has a single 36 kW CCS socket. 20 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge EV Waitrose - Exeter, 0.3 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 21 Apr 2024Last verified 21 Apr 2024

Connectors

CCS · 36 kW1 connector

Site information

Operator
Wenea
Opening hours
Not published
Access
Public

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 36 kW CCS~1h 37m
Tesla Model 3 Rear-Wheel Drive 10–80% · 36 kW CCS~70 min
Audi Q4 e-tron 50 10–80% · 36 kW CCS~1h 30m
Hyundai IONIQ 5 10–80% · 36 kW CCS~89 min
MG Motor MG4 Trophy 10–80% · 36 kW CCS~75 min
Hyundai Kona Electric Long Range 10–80% · 36 kW CCS~72 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at UK_EX_BELMONT_01 (Wenea)?

Up to 36 kW DC via CCS.

How many charging sockets does UK_EX_BELMONT_01 (Wenea) have?

1 charging socket: 1 × 36 kW CCS.

Who operates UK_EX_BELMONT_01?

UK_EX_BELMONT_01 is on the Wenea network.

Where is the nearest charger with 50 kW or more to UK_EX_BELMONT_01 (Wenea)?

Shell Recharge EV Waitrose - Exeter is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at UK_EX_BELMONT_01 (Wenea)?

A typical 10–80% rapid charge takes about 1h 37m on the 36 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at UK_EX_BELMONT_01 (Wenea)?

A typical 10–80% rapid charge takes about 70 min on the 36 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at UK_EX_BELMONT_01 (Wenea)?

A typical 10–80% rapid charge takes about 1h 30m on the 36 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 21 Apr 2024

Amp Map does not take payment. You pay the operator.