Wenea · EV charging site
West Street Car Park
West Street, Axminster, EX13 5AG
West Street Car Park is an EV charging site in Axminster, Devon, run by Wenea. All 6 of its sockets are 60 kW CCS, and the price is listed as £0.75/kWh. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is UK_EX_DOLPHIN_01 (Wenea), 4.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Wenea
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 30 Aug 2023)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at West Street Car Park (Wenea)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at West Street Car Park (Wenea)?
Up to 60 kW DC via CCS.
How many charging sockets does West Street Car Park (Wenea) have?
6 charging sockets: 2 × 60 kW CCS, 2 × 60 kW CCS, 2 × 60 kW CCS.
Who operates West Street Car Park?
West Street Car Park is on the Wenea network.
Where is the nearest other charger with 50 kW or more to West Street Car Park (Wenea)?
UK_EX_DOLPHIN_01 (Wenea) is 4.1 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at West Street Car Park (Wenea)?
A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at West Street Car Park (Wenea)?
A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at West Street Car Park (Wenea)?
A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.