# Tebay Services Southbound · Westmorland Family

Web page: https://ampmap.co.uk/charger/westmorland-family-tebay-services-southbound-uk

Tebay Services Southbound is an EV charging site in Kendal, Cumbria, run by Westmorland Family. Its 4 sockets reach up to 150 kW, with CCS at the top speed, and the price is listed as £0.64/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Tebay Services Southbound, CA10 3SB
- **Area:** Kendal, Cumbria, United Kingdom
- **Coordinates (latitude, longitude):** 54.45353, -2.60606

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 150 kW | 4 | Not listed |
| CCS | 104 kW | 4 | Not listed |

- **Price:** £0.64/kWh (from Open Charge Map)

## Site information

- **Operator:** Westmorland Family
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** Managed by SWARCO e-Connect. Can be activated from the Evolt network app and Electroverse.

## Common questions

### How much does it cost to charge at Tebay Services Southbound (Westmorland Family)?

The listed price is £0.64/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Tebay Services Southbound (Westmorland Family)?

Up to 150 kW DC via CCS.

### How many charging sockets does Tebay Services Southbound (Westmorland Family) have?

4 charging sockets: 4 × 104 kW CCS, 4 × 150 kW CCS.

### Who operates Tebay Services Southbound?

Tebay Services Southbound is on the Westmorland Family network.

### How long does a Tesla Model Y Long Range take to charge at Tebay Services Southbound (Westmorland Family)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tebay Services Southbound (Westmorland Family)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Tebay Services Southbound (Westmorland Family)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Kendal](https://ampmap.co.uk/chargers/united-kingdom/cumbria/kendal)

## Chargers near this site

- [Tebay, UK · Tesla](https://ampmap.co.uk/charger/tesla-penrith-uk-tebay-southbound-supercharger-uk) - CCS 250 kW · M6 Junction 38/39 · From 64p/kWh
- [Tebay Services Northbound · Evolt](https://ampmap.co.uk/charger/evolt-network-tebay-services-northbound-uk) - NACS 17 kW, Type 2 7 kW · Orton
- [Westmorland Tebay Northbound Services · Evolt](https://ampmap.co.uk/charger/evolt-network-westmorland-tebay-northbound-services-uk) - CCS 150 kW, CCS 104 kW · Westmorland Tebay Northbound Services

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/westmorland-family-tebay-services-southbound-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 Apr 2026).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
