WIGHTLINK · EV charging site
Wightlink
Wightlink - Lymington Ferry, New Milton, SO41 3SE
Wightlink is an EV charging site in New Milton, Hampshire, run by WIGHTLINK and open 24 hours a day. It has a single 80 kW CCS socket. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 100% uptime and recorded 23 charging sessions here over the last 30 days. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bath Road Car Park (Be.EV), 0.2 miles away.
Status
1 of 1 available
Checking status…
Connectors
CCS · 80 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- WIGHTLINK
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the operator's appRFID card
- Charger ID
- ULTRA0217-A
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Wightlink?
Up to 80 kW DC via CCS.
How many charging sockets does Wightlink have?
1 charging socket: 1 × 80 kW CCS. Live per-socket availability is shown on this page.
Is Wightlink open 24/7?
Yes - Wightlink is open 24 hours a day, 7 days a week.
When is Wightlink busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 9 pm. The live status on this page shows what is free before you set off.
How reliable is Wightlink?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 23 observed charging sessions.
Who operates Wightlink?
Wightlink is on the WIGHTLINK network.
Where is the nearest other charger with 50 kW or more to Wightlink?
Bath Road Car Park (Be.EV) is 0.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Wightlink?
A typical 10–80% rapid charge takes about 44 min on the 80 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wightlink?
A typical 10–80% rapid charge takes about 33 min on the 80 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wightlink?
A typical 10–80% rapid charge takes about 47 min on the 80 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Bath Road 1
- Bath Road Car Park
- EVC Macdonald Elmers Court Hotel & Resort
- St Thomas Street Car Park Lymington
- Barfields Car Park 2
- Barfields Car Park
- Cheapest nearby
- Bath Road Car Park · 59p per kWh · 75 kW · 0.2 mi
- Fastest nearby
- St Thomas Street Car Park Lymington · 150 kW · 0.7 mi