# Wightlink

Web page: https://ampmap.co.uk/charger/wightlink-2-uk

Wightlink is an EV charging site in New Milton, Hampshire, run by WIGHTLINK and open 24 hours a day. It has a single 80 kW CCS socket. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 100% uptime and recorded 23 charging sessions here over the last 30 days.

## Status

1 of 1 open at 22 Nov 2026, 12:31 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Wightlink - Lymington Ferry, SO41 3SE
- **Area:** New Milton, Hampshire, United Kingdom
- **Coordinates (latitude, longitude):** 50.75693, -1.52888

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 80 kW | 1 | Not listed | 1 free |

## Site information

- **Operator:** WIGHTLINK
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the operator's app; RFID card

## Common questions

### How fast is charging at Wightlink?

Up to 80 kW DC via CCS.

### How many charging sockets does Wightlink have?

1 charging socket: 1 × 80 kW CCS. Live per-socket availability is shown on this page.

### Is Wightlink open 24/7?

Yes - Wightlink is open 24 hours a day, 7 days a week.

### When is Wightlink busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 9 pm. The live status on this page shows what is free before you set off.

### How reliable is Wightlink?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 23 observed charging sessions.

### Who operates Wightlink?

Wightlink is on the WIGHTLINK network.

### How long does a Tesla Model Y Long Range take to charge at Wightlink?

A typical 10–80% rapid charge takes about 44 min on the 80 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wightlink?

A typical 10–80% rapid charge takes about 33 min on the 80 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Wightlink?

A typical 10–80% rapid charge takes about 47 min on the 80 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in New Milton](https://ampmap.co.uk/chargers/united-kingdom/hampshire/new-milton)
- [Cheapest charging in New Milton](https://ampmap.co.uk/chargers/united-kingdom/hampshire/new-milton/cheapest)
- [WIGHTLINK chargers](https://ampmap.co.uk/networks/wightlink)

## Chargers near this site

- [Bath Road 1 · Joju Ltd](https://ampmap.co.uk/charger/joju-ltd-bath-road-1-uk) - Type 2 7 kW · Bath Road Car Park
- [Bath Road Car Park · Be.EV](https://ampmap.co.uk/charger/mer-bath-road-car-park-uk) - CCS 75 kW, Type 2 7 kW · Bath Road · From 59p/kWh
- [EVC Macdonald Elmers Court Hotel & Resort · Roam Charging](https://ampmap.co.uk/charger/roam-charging-evc-macdonald-elmers-court-hotel-and-resort-uk) - Type 2 22 kW · S Baddesley Rd
- [St Thomas Street Car Park Lymington · Be.EV](https://ampmap.co.uk/charger/be-ev-st-thomas-street-car-park-lymington-uk) - CCS 150 kW, CHAdeMO 50 kW · St Thomas Street Car Park · From 84p/kWh
- [Barfields Car Park 2 · Be.EV](https://ampmap.co.uk/charger/be-ev-barfields-car-park-2-uk) - CCS 50 kW · Barfields · From 84p/kWh
- [Barfields Car Park · Be.EV](https://ampmap.co.uk/charger/joju-ltd-barfields-2-uk) - Type 2 22 kW · Barfields · From 59p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/wightlink-2-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: WIGHTLINK (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
