# Windy Harbour Farm Hotel

Web page: https://ampmap.co.uk/charger/windy-harbour-farm-hotel-uk

Windy Harbour Farm Hotel is an EV charging site in Glossop, Derbyshire, run by Windy Harbour Farm Hotel and open 24 hours a day. Both of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 7 pm, and Amp Map measured 100% uptime and recorded 1 charging session here over the last 30 days.

## Status

1 of 2 open at 22 Nov 2026, 18:56 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Woodhead Rd, SK13 7QE
- **Area:** Glossop, Derbyshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.45989, -1.94400

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed | 1 free, 1 status unknown |

## Site information

- **Operator:** Windy Harbour Farm Hotel
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Windy Harbour Farm Hotel?

Up to 7 kW AC via Type 2.

### How many charging sockets does Windy Harbour Farm Hotel have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

### Is Windy Harbour Farm Hotel open 24/7?

Yes - Windy Harbour Farm Hotel is open 24 hours a day, 7 days a week.

### When is Windy Harbour Farm Hotel busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 7 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Windy Harbour Farm Hotel?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1 observed charging session.

### Who operates Windy Harbour Farm Hotel?

Windy Harbour Farm Hotel is on the Windy Harbour Farm Hotel network.

### How long does a Tesla Model Y Long Range take to charge at Windy Harbour Farm Hotel?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Windy Harbour Farm Hotel?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Windy Harbour Farm Hotel?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Glossop](https://ampmap.co.uk/chargers/united-kingdom/derbyshire/glossop)

## Chargers near this site

- [Station Road Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-station-road-car-park-uk) - CCS / CHAdeMO / Type 2 50 kW · Station Road Car Park, Station Road · From 89p/kWh
- [Edward Street Car Park - HPBC · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-81081-uk) - Type 2 7 kW · Edward Street Car Park - HPBC, 50 Edward Stre · From 65p/kWh
- [Howard Town Shopping Park · POGO](https://ampmap.co.uk/charger/pogo-howard-town-shopping-park-uk) - CCS 100 kW · Howard St · From 65p/kWh
- [Howard Street · Evolt](https://ampmap.co.uk/charger/evolt-network-howard-street-uk) - CCS 100 kW · Howard Street
- [Municipal Buildings · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-municipal-buildings-uk) - CCS / CHAdeMO / Type 2 50 kW · Municipal Buildings, 15 Victoria Street · From 89p/kWh
- [Hattersley District Centre · Be.EV](https://ampmap.co.uk/charger/be-ev-hattersley-district-centre-uk) - CCS 300 kW · Stockport Road · From 59p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/windy-harbour-farm-hotel-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Windy Harbour Farm Hotel (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
