# Wkw Engineering

Web page: https://ampmap.co.uk/charger/wkw-engineering-uk

Wkw Engineering is an EV charging site in Halifax, Calderdale, run by WKW ENGINEERING and open 24 hours a day. Both of its sockets are 22 kW Type 2. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 100% uptime and recorded 8 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 12:44 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Shaw Ln, HX3
- **Area:** Halifax, Calderdale, United Kingdom
- **Coordinates (latitude, longitude):** 53.71537, -1.85592
- **Parking:** Car park

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed | 2 free |

## Site information

- **Operator:** WKW ENGINEERING
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Wkw Engineering?

Up to 22 kW AC via Type 2.

### How many charging sockets does Wkw Engineering have?

2 charging sockets: 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is Wkw Engineering open 24/7?

Yes - Wkw Engineering is open 24 hours a day, 7 days a week.

### When is Wkw Engineering busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

### How reliable is Wkw Engineering?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 8 observed charging sessions.

### Who operates Wkw Engineering?

Wkw Engineering is on the WKW ENGINEERING network.

### How long does a Tesla Model Y Long Range take to charge at Wkw Engineering?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wkw Engineering?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Wkw Engineering?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Halifax](https://ampmap.co.uk/chargers/united-kingdom/calderdale/halifax)

## Chargers near this site

- [Bristol Street Motors, Halifax · Nissan UK Dealer Network](https://ampmap.co.uk/charger/nissan-uk-dealer-network-bristol-street-motors-halifax-uk) - CHAdeMO 50 kW, BS1363 3 Pin 13 Amp 3 kW · Shay Syke
- [Eureka! EV](https://ampmap.co.uk/charger/eureka-ev-uk) - Type 2 7 kW · Discovery Road,
- [St Johns Lane · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-st-johns-lane-uk) - CHAdeMO 50 kW, Type 2 50 kW · St. Johns Lane
- [St Johns Lane Car Park · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-st-johns-lane-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · St. Johns Lane
- [O&C Car Parks Ltd](https://ampmap.co.uk/charger/o-and-c-car-parks-ltd-uk) - Type 2 11 kW · Horton St
- [High Street Car Park · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-high-street-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · High Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/wkw-engineering-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: WKW ENGINEERING (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
