# Wokingham Borough Council

Web page: https://ampmap.co.uk/charger/wokingham-borough-council-28-uk

Wokingham Borough Council is an EV charging site in Wokingham, run by Wokingham Borough Council and open 24 hours a day. It has a single 7 kW Type 2 socket. Recorded live status shows it is usually busiest around 8 pm, and Amp Map measured 100% uptime and recorded 4 charging sessions here over the last 30 days.

## Status

1 of 1 open at 22 Nov 2026, 20:05 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Daffodil Drive, RG40 4DS
- **Area:** Wokingham, United Kingdom
- **Coordinates (latitude, longitude):** 51.37841, -0.85660
- **Parking:** Car park

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed | 1 free |

## Site information

- **Operator:** Wokingham Borough Council
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Wokingham Borough Council?

Up to 7 kW AC via Type 2.

### How many charging sockets does Wokingham Borough Council have?

1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.

### Is Wokingham Borough Council open 24/7?

Yes - Wokingham Borough Council is open 24 hours a day, 7 days a week.

### When is Wokingham Borough Council busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 8 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Wokingham Borough Council?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 4 observed charging sessions.

### Who operates Wokingham Borough Council?

Wokingham Borough Council is on the Wokingham Borough Council network.

### How long does a Tesla Model Y Long Range take to charge at Wokingham Borough Council?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wokingham Borough Council?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Wokingham Borough Council?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Wokingham](https://ampmap.co.uk/chargers/united-kingdom/wokingham/wokingham)
- [Wokingham Borough Council chargers](https://ampmap.co.uk/networks/wokingham-borough-council)

## Chargers near this site

- [Wokingham Borough Council](https://ampmap.co.uk/charger/wokingham-borough-council-27-uk) - Type 2 7 kW · Primrose Crescent
- [Wokingham Borough Council](https://ampmap.co.uk/charger/wokingham-borough-council-13-uk) - Type 2 7 kW · Redlands House, Arnett Avenue
- [Wokingham Borough Council](https://ampmap.co.uk/charger/wokingham-borough-council-12-uk) - Type 2 7 kW · Hennerton House, Arnett Avenue
- [Cresswells Garage · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-cresswells-garage-uk) - CCS 50 kW, CHAdeMO 50 kW · 188 Nine Mile Road
- [Roycroft Ln · Flowbird](https://ampmap.co.uk/charger/flowbird-roycroft-ln-uk) - Type 2 7 kW · Roycroft Ln
- [California Country Park · evcharge.online](https://ampmap.co.uk/charger/evcharge-online-california-country-park-uk) - Type 2 11 kW · California Country Park

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/wokingham-borough-council-28-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Wokingham Borough Council (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
