Zero Carbon World · EV charging site
Best Western Heath Court Hotel
Moulton Road, Newmarket, CB8 8DY
Best Western Heath Court Hotel is an EV charging site in Newmarket, Suffolk, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Hyperion SF Connect (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01638 667171
- Notes
- Intended for users of the hotel, so please give them some business?
- Getting there
- Points are to left of main entrance door
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Best Western Heath Court Hotel (Zero Carbon World)?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.
How many charging sockets does Best Western Heath Court Hotel (Zero Carbon World) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.
Who operates Best Western Heath Court Hotel?
Best Western Heath Court Hotel is on the Zero Carbon World network. For site issues, the operator lists 01638 667171.
Where is the nearest charger with 50 kW or more to Best Western Heath Court Hotel (Zero Carbon World)?
Hyperion SF Connect (BP Pulse) is 0.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Best Western Heath Court Hotel (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Best Western Heath Court Hotel (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Best Western Heath Court Hotel (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Hyperion SF Connect
- All Saints Car Park
- McDonald's, Newmarket
- Pod Point Tesco Extra - Newmarket
- Newmarket, UK
- Newmarket Rowley Mile Course
- Cheapest nearby
- Pod Point Tesco Extra - Newmarket · 44.4p per kWh · 50 kW · 1.3 mi
- Fastest nearby
- Newmarket, UK · 250 kW · 1.4 mi