Zero Carbon World · EV charging site
Best Western Kinloch Hotel
Kinloch Court, Isle of Arran, KA27 8ET
Best Western Kinloch Hotel is an EV charging site in Isle of Arran, North Ayrshire, run by Zero Carbon World. It has a single 4 kW Type 2 socket. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Shore Road Car Park (Chargeplace Scotland), 9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01770 860444
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Best Western Kinloch Hotel (Zero Carbon World)?
Up to 4 kW AC via Type 2.
How many charging sockets does Best Western Kinloch Hotel (Zero Carbon World) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates Best Western Kinloch Hotel?
Best Western Kinloch Hotel is on the Zero Carbon World network. For site issues, the operator lists 01770 860444.
Where is the nearest charger with 50 kW or more to Best Western Kinloch Hotel (Zero Carbon World)?
Shore Road Car Park (Chargeplace Scotland) is 9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Best Western Kinloch Hotel (Zero Carbon World)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Best Western Kinloch Hotel (Zero Carbon World)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Best Western Kinloch Hotel (Zero Carbon World)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- EVC Kinloch Hotel · 22 kW · 70 yd