Zero Carbon World · EV charging site
Best Western Nottingham Derby
Bostock Lane, Long Eaton, NG10 4EP
Best Western Nottingham Derby is an EV charging site in Long Eaton, Derbyshire, run by Zero Carbon World. It has a single 7 kW Type 2 socket. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Novotel Nottingham Derby Hotel (BP Pulse), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0115 946 0000
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Best Western Nottingham Derby (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does Best Western Nottingham Derby (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Best Western Nottingham Derby?
Best Western Nottingham Derby is on the Zero Carbon World network. For site issues, the operator lists 0115 946 0000.
Where is the nearest charger with 50 kW or more to Best Western Nottingham Derby (Zero Carbon World)?
Novotel Nottingham Derby Hotel (BP Pulse) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Best Western Nottingham Derby (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Best Western Nottingham Derby (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Best Western Nottingham Derby (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Novotel Nottingham Derby Hotel
- Holiday Inn Derby
- Pod Point Tesco Extra - Nottingham Long Eaton
- KFC Long Eaton
- Gibb Street Car Park
- Toton Park & Ride
- Cheapest nearby
- Pod Point Tesco Extra - Nottingham Long Eaton · 44.4p per kWh · 7 kW · 1.4 mi
- Fastest nearby
- Holiday Inn Derby · 200 kW · 0.7 mi