Zero Carbon World · EV charging site
Best Western Valley Hotel
22 Buildwas Road, Telford, TF8 7DW
Best Western Valley Hotel is an EV charging site in Telford, Telford and Wrekin, run by Zero Carbon World. It has a single 7 kW Type 2 socket. No other charging site is listed within a mile, and the nearest site with 50 kW or more is KFC Instavolt (InstaVolt Ltd), 1.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01952 432247
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Best Western Valley Hotel (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does Best Western Valley Hotel (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Best Western Valley Hotel?
Best Western Valley Hotel is on the Zero Carbon World network. For site issues, the operator lists 01952 432247.
Where is the nearest charger with 50 kW or more to Best Western Valley Hotel (Zero Carbon World)?
KFC Instavolt (InstaVolt Ltd) is 1.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Best Western Valley Hotel (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Best Western Valley Hotel (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Best Western Valley Hotel (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- KFC Instavolt
- Pod Point Tesco Superstore - Madeley
- EVC Telford Hotel, Spa & Golf Resort
- Britannia Inn, Telford
- Pod Point Sanctuary Group - Webb Grange
- Brookside Community Centre
- Cheapest nearby
- Pod Point Sanctuary Group - Webb Grange · 39.6p per kWh · 7 kW · 2.5 mi
- Fastest nearby
- EVC Telford Hotel, Spa & Golf Resort · 100 kW · 2.1 mi