Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Zero Carbon World · EV charging site

Cabot Circus

Cabot Circus, Bristol, BS2 9AB

Cabot Circus is an EV charging site in Bristol, City of Bristol, run by Zero Carbon World. Its 6 sockets reach up to 7 kW, with Type 2 at the top speed, and the price is listed as Normal Parking Fees Apply. 20 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Budgens Broadmead, 0.1 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 18 Jul 2019Last verified 18 Jul 2019

Connectors

Type 2 · 7 kW2 connectors
BS1363 3 Pin 13 Amp2 connectors

Site information

Opening hours
Not published
Access
Public
Price
Normal Parking Fees Apply.(from Open Charge Map, 18 Jul 2019)
Phone (from Open Charge Map)
01179 529360
Notes
Charge bays on level 1 & 2. 24 hrs. Some parking bays designed for smaller cars like G-Wiz, but Leaf, Tesla can fit if carefully parked.
Getting there
On 1st and 2nd Floors Zone A Level G. SatNav - use BS2 9DA Units are http://www.pod-point.com/

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Cabot Circus (Zero Carbon World)?

The listed price is Normal Parking Fees Apply.. Prices can change, so check the price at the charger before you start.

How fast is charging at Cabot Circus (Zero Carbon World)?

Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.

How many charging sockets does Cabot Circus (Zero Carbon World) have?

6 charging sockets: 2 × 7 kW Type 2, 2 × BS1363 3 Pin 13 Amp.

Who operates Cabot Circus?

Cabot Circus is on the Zero Carbon World network. For site issues, the operator lists 01179 529360.

Where is the nearest charger with 50 kW or more to Cabot Circus (Zero Carbon World)?

Shell Recharge Shell Budgens Broadmead is 0.1 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Cabot Circus (Zero Carbon World)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cabot Circus (Zero Carbon World)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Cabot Circus (Zero Carbon World)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 18 Jul 2019

Amp Map does not take payment. You pay the operator.