Zero Carbon World · EV charging site
Carno Community Centre
Carno, Llanidloes, SY17 5LH
Carno Community Centre is an EV charging site in Llanidloes, Sir Powys, run by Zero Carbon World. Its 3 sockets reach up to 7 kW, with Blue Commando (2P+E) and Type 2 at the top speed. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Back Lane Car Park Newtown (Evolt), 9.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01686 420329
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Carno Community Centre (Zero Carbon World)?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Blue Commando (2P+E), Type 2.
How many charging sockets does Carno Community Centre (Zero Carbon World) have?
3 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Blue Commando (2P+E), 1 × 7 kW Type 2.
Who operates Carno Community Centre?
Carno Community Centre is on the Zero Carbon World network. For site issues, the operator lists 01686 420329.
Where is the nearest charger with 50 kW or more to Carno Community Centre (Zero Carbon World)?
Back Lane Car Park Newtown (Evolt) is 9.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Carno Community Centre (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Carno Community Centre (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Carno Community Centre (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.