# Dan-y-Gyrn Workbase National Trust · Zero Carbon World

Web page: https://ampmap.co.uk/charger/zero-carbon-world-dan-y-gyrn-workbase-national-trust-uk

Dan-y-Gyrn Workbase National Trust is an EV charging site in Merthyr Tydfil, Merthyr Tydfil County Borough, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Blaenglyn Farm, Blaen Glyw,, LD3 8NF
- **Area:** Merthyr Tydfil, Merthyr Tydfil County Borough, United Kingdom
- **Coordinates (latitude, longitude):** 51.90064, -3.47985

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 1 | Not listed |

## Site information

- **Operator:** Zero Carbon World
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How fast is charging at Dan-y-Gyrn Workbase National Trust (Zero Carbon World)?

Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.

### How many charging sockets does Dan-y-Gyrn Workbase National Trust (Zero Carbon World) have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.

### Who operates Dan-y-Gyrn Workbase National Trust?

Dan-y-Gyrn Workbase National Trust is on the Zero Carbon World network. For site issues, the operator lists 01874 625072.

### How long does a Tesla Model Y Long Range take to charge at Dan-y-Gyrn Workbase National Trust (Zero Carbon World)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Dan-y-Gyrn Workbase National Trust (Zero Carbon World)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Dan-y-Gyrn Workbase National Trust (Zero Carbon World)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Merthyr Tydfil](https://ampmap.co.uk/chargers/united-kingdom/merthyr-tydfil-county-borough/merthyr-tydfil)
- [Zero Carbon World chargers](https://ampmap.co.uk/networks/zero-carbon-world)

## Chargers near this site

- [Pod Point Brecon Beacons National Park](https://ampmap.co.uk/charger/pod-point-brecon-beacons-national-park-2-uk) - Type 2 7 kW · Libanus · From 45.6p/kWh
- [Pod Point Brecon Beacons - Ffrwdgrech Depot](https://ampmap.co.uk/charger/pod-point-brecon-beacons-ffrwdgrech-depot-2-uk) - Type 2 22 kW · Ffrwdgrech Industrial Estate · From 45.6p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/zero-carbon-world-dan-y-gyrn-workbase-national-trust-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 May 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
