Zero Carbon World · EV charging site
Edmundson Electrical Ltd
Unit C, The Frenbury Estate, Bowthorpe, NR6 5DP
Edmundson Electrical Ltd is an EV charging site in Bowthorpe, Norfolk, run by Zero Carbon World. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed. No other charging site is listed within a mile, and the nearest site with 50 kW or more is MFG BP Broadside (GeniePoint), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Customers only
- Phone (from Open Charge Map)
- 01603 405123
- Getting there
- Private Charger
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Edmundson Electrical Ltd (Zero Carbon World)?
Up to 22 kW AC via Type 2.
How many charging sockets does Edmundson Electrical Ltd (Zero Carbon World) have?
2 charging sockets: 1 × 11 kW Type 2, 1 × 22 kW Type 2.
Who operates Edmundson Electrical Ltd?
Edmundson Electrical Ltd is on the Zero Carbon World network. For site issues, the operator lists 01603 405123.
Can anyone charge at Edmundson Electrical Ltd (Zero Carbon World)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Edmundson Electrical Ltd (Zero Carbon World)?
MFG BP Broadside (GeniePoint) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Edmundson Electrical Ltd (Zero Carbon World)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Edmundson Electrical Ltd (Zero Carbon World)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Edmundson Electrical Ltd (Zero Carbon World)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- MFG BP Broadside
- MFG Mile Cross Lane
- Desira Nissan
- Dingle's Toyota
- Norwich, UK - Mile Cross
- Pod Point McDonald's - Norwich Airport
- Cheapest nearby
- Pod Point McDonald's - Norwich Airport · 27.6p per kWh · 7 kW · 1.2 mi
- Fastest nearby
- Norwich, UK - Mile Cross · 250 kW · 1.2 mi