# Gallery Forty5 · Zero Carbon World

Web page: https://ampmap.co.uk/charger/zero-carbon-world-gallery-forty5-uk

Gallery Forty5 is an EV charging site in Ashington, Northumberland, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed, and the price is listed as Donation to cover usage costs.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 45 Main Street,, NE65 9PP
- **Area:** Ashington, Northumberland, United Kingdom
- **Coordinates (latitude, longitude):** 55.29807, -1.71124

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 1 | Not listed |

- **Price:** Donation to cover usage costs (from Open Charge Map)

## Site information

- **Operator:** Zero Carbon World
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Available during opening hours: Monday to Saturday 10 to 5, Sunday Closed

## Common questions

### How much does it cost to charge at Gallery Forty5 (Zero Carbon World)?

The listed price is Donation to cover usage costs. Prices can change, so check the price at the charger before you start.

### How fast is charging at Gallery Forty5 (Zero Carbon World)?

Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.

### How many charging sockets does Gallery Forty5 (Zero Carbon World) have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.

### Who operates Gallery Forty5?

Gallery Forty5 is on the Zero Carbon World network. For site issues, the operator lists 01670 783424.

### How long does a Tesla Model Y Long Range take to charge at Gallery Forty5 (Zero Carbon World)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gallery Forty5 (Zero Carbon World)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Gallery Forty5 (Zero Carbon World)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Ashington](https://ampmap.co.uk/chargers/united-kingdom/northumberland/ashington)
- [Zero Carbon World chargers](https://ampmap.co.uk/networks/zero-carbon-world)

## Chargers near this site

- [Mains Street 1, Felton · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-mains-street-1-felton-uk) - Type 2 7 kW · Main Street 1
- [EVC Macdonald Linden Hall Hotel · Roam Charging](https://ampmap.co.uk/charger/roam-charging-evc-macdonald-linden-hall-hotel-uk) - Type 2 7 kW · Longhorsley

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/zero-carbon-world-gallery-forty5-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 12 Jun 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
