# Glyndebourne Productions Ltd · Zero Carbon World

Web page: https://ampmap.co.uk/charger/zero-carbon-world-glyndebourne-productions-ltd-uk

Glyndebourne Productions Ltd is an EV charging site in Lewes, East Sussex, run by Zero Carbon World. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed, and the price is listed as Free to ticket holders.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Glyndebourne, BN8 5UU
- **Area:** Lewes, East Sussex, United Kingdom
- **Coordinates (latitude, longitude):** 50.87857, 0.06622

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 1 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 1 | Not listed |

- **Price:** Free to ticket holders (from Open Charge Map)

## Site information

- **Operator:** Zero Carbon World
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** info@glyndebourne.com

## Common questions

### How much does it cost to charge at Glyndebourne Productions Ltd (Zero Carbon World)?

The listed price is Free to ticket holders. Prices can change, so check the price at the charger before you start.

### How fast is charging at Glyndebourne Productions Ltd (Zero Carbon World)?

Up to 22 kW AC via Type 2, BS1363 3 Pin 13 Amp.

### How many charging sockets does Glyndebourne Productions Ltd (Zero Carbon World) have?

2 charging sockets: 1 × 22 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.

### Who operates Glyndebourne Productions Ltd?

Glyndebourne Productions Ltd is on the Zero Carbon World network. For site issues, the operator lists 01273 812321.

### How long does a Tesla Model Y Long Range take to charge at Glyndebourne Productions Ltd (Zero Carbon World)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Glyndebourne Productions Ltd (Zero Carbon World)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Glyndebourne Productions Ltd (Zero Carbon World)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Lewes](https://ampmap.co.uk/chargers/united-kingdom/east-sussex/lewes)
- [Zero Carbon World chargers](https://ampmap.co.uk/networks/zero-carbon-world)

## Chargers near this site

- [Pod Point Glyndebourne Audience Car Park](https://ampmap.co.uk/charger/pod-point-glyndebourne-audience-car-park-uk) - Type 2 7 kW · New Road Lewes · From 50.4p/kWh
- [Pod Point Glyndebourne Production Hub](https://ampmap.co.uk/charger/pod-point-glyndebourne-production-hub-2-uk) - Type 2 7 kW, Type 2 3 kW · New Road Lewes · From 50.4p/kWh
- [Kings Academy Ringmer · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-kings-academy-ringmer-uk) - CCS / CHAdeMO / Type 2 50 kW · Kings Academy Ringmer, Lewes Road · From 89p/kWh
- [Malling SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-malling-sf-connect-uk) - CCS 150 kW · 96-106 Malling Street
- [Phoenix Causeway Car Park · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-phoenix-causeway-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Harveys Way
- [Pod Point Tesco Superstore - Lewes](https://ampmap.co.uk/charger/pod-point-tesco-superstore-lewes-uk) - Type 2 7 kW · Brooks Road · From 44.4p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/zero-carbon-world-glyndebourne-productions-ltd-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 18 Nov 2014).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
