Zero Carbon World · EV charging site
Greenfield Engineering Sheet Metal
Neet Way, Holsworthy, EX22 6ES
Greenfield Engineering Sheet Metal is an EV charging site in Holsworthy, Devon, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Holsworthy SF Connect (BP Pulse), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01409 254400
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Greenfield Engineering Sheet Metal (Zero Carbon World)?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.
How many charging sockets does Greenfield Engineering Sheet Metal (Zero Carbon World) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.
Who operates Greenfield Engineering Sheet Metal?
Greenfield Engineering Sheet Metal is on the Zero Carbon World network. For site issues, the operator lists 01409 254400.
Where is the nearest charger with 50 kW or more to Greenfield Engineering Sheet Metal (Zero Carbon World)?
Holsworthy SF Connect (BP Pulse) is 0.5 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Greenfield Engineering Sheet Metal (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Greenfield Engineering Sheet Metal (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Greenfield Engineering Sheet Metal (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Holsworthy SF Connect · 150 kW · 0.5 mi