# Hedley House Hotel · Zero Carbon World

Web page: https://ampmap.co.uk/charger/zero-carbon-world-hedley-house-hotel-uk

Hedley House Hotel is an EV charging site in York, City of York, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed, and the price is listed as Free for customers.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 3 Bootham Terrace, YO30 7DH
- **Area:** York, City of York, United Kingdom
- **Coordinates (latitude, longitude):** 53.96433, -1.09106

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 1 | Not listed |

- **Price:** Free for customers (from Open Charge Map)

## Site information

- **Operator:** Zero Carbon World
- **Opening hours:** Not published
- **Access:** Customers only

## Common questions

### How much does it cost to charge at Hedley House Hotel (Zero Carbon World)?

The listed price is Free for customers. Prices can change, so check the price at the charger before you start.

### How fast is charging at Hedley House Hotel (Zero Carbon World)?

Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.

### How many charging sockets does Hedley House Hotel (Zero Carbon World) have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.

### Who operates Hedley House Hotel?

Hedley House Hotel is on the Zero Carbon World network. For site issues, the operator lists 01904 637404.

### Can anyone charge at Hedley House Hotel (Zero Carbon World)?

The operator lists this charger for customers of the site.

### How long does a Tesla Model Y Long Range take to charge at Hedley House Hotel (Zero Carbon World)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hedley House Hotel (Zero Carbon World)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Hedley House Hotel (Zero Carbon World)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in York](https://ampmap.co.uk/chargers/united-kingdom/city-of-york/york)
- [Cheapest charging in York](https://ampmap.co.uk/chargers/united-kingdom/city-of-york/york/cheapest)
- [Zero Carbon World chargers](https://ampmap.co.uk/networks/zero-carbon-world)

## Chargers near this site

- [Marygate Car Park - City of York Council · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-marygate-car-park-city-of-york-council-uk) - Type 2 7 kW · Marygate Car Park, 9 Frederick Street · From 65p/kWh
- [The Groves · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-the-groves-uk) - Blue Commando (2P+E) 7 kW, BS1363 3 Pin 13 Amp 3 kW · 15 St Peters Grove
- [Bootham Row Car Park · BP Pulse](https://ampmap.co.uk/charger/charge-your-car-bootham-row-car-park-uk) - Type 2 7 kW · Bootham Row Car Park, Bootham Row · From 65p/kWh
- [Union Terrace Car Park · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-union-terrace-car-park-uk) - Type 2 7 kW, Type 2 3 kW · Union Terrace
- [Pod Point Lendal Tower](https://ampmap.co.uk/charger/pod-point-lendal-tower-uk) - Type 2 7 kW · Lendal Bridge · From 55.2p/kWh
- [Dean Court Hotels · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-dean-court-hotels-uk) - Type 2 7 kW · Duncombe Place

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/zero-carbon-world-hedley-house-hotel-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 29 May 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
