# Hoe Grange Holidays · Zero Carbon World

Web page: https://ampmap.co.uk/charger/zero-carbon-world-hoe-grange-holidays-uk

Hoe Grange Holidays is an EV charging site in Belper, Derbyshire, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Hoe Grange, DE4 4HP
- **Area:** Belper, Derbyshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.09942, -1.67943

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Zero Carbon World
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at Hoe Grange Holidays (Zero Carbon World)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Hoe Grange Holidays (Zero Carbon World)?

Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.

### How many charging sockets does Hoe Grange Holidays (Zero Carbon World) have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 3 kW BS1363 3 Pin 13 Amp.

### Who operates Hoe Grange Holidays?

Hoe Grange Holidays is on the Zero Carbon World network. For site issues, the operator lists 01629 540262.

### How long does a Tesla Model Y Long Range take to charge at Hoe Grange Holidays (Zero Carbon World)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hoe Grange Holidays (Zero Carbon World)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Hoe Grange Holidays (Zero Carbon World)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Belper](https://ampmap.co.uk/chargers/united-kingdom/derbyshire/belper)
- [Zero Carbon World chargers](https://ampmap.co.uk/networks/zero-carbon-world)

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/zero-carbon-world-hoe-grange-holidays-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 15 Mar 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
