Zero Carbon World · EV charging site
Lasswade Country House
Station Road, Builth Wells, LD5 4RW
Lasswade Country House is an EV charging site in Builth Wells, Sir Powys, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 and Blue Commando (2P+E) at the top speed. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Castle Street (Evolt), 10.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01591 610515
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Lasswade Country House (Zero Carbon World)?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp, Blue Commando (2P+E).
How many charging sockets does Lasswade Country House (Zero Carbon World) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Blue Commando (2P+E).
Who operates Lasswade Country House?
Lasswade Country House is on the Zero Carbon World network. For site issues, the operator lists 01591 610515.
Where is the nearest charger with 50 kW or more to Lasswade Country House (Zero Carbon World)?
Castle Street (Evolt) is 10.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lasswade Country House (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lasswade Country House (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lasswade Country House (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.