Zero Carbon World · EV charging site
Mains Farm Wigwams
Mains Farm Wigwams, Stirling, FK8 3QR
Mains Farm Wigwams is an EV charging site in Stirling, run by Zero Carbon World. Both of its sockets are 3 kW BS1363 3 Pin 13 Amp and Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Station Road Car Park (Chargeplace Scotland), 5.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Customers only
- Phone (from Open Charge Map)
- 01786850735
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Mains Farm Wigwams (Zero Carbon World)?
Up to 3 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does Mains Farm Wigwams (Zero Carbon World) have?
2 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 3 kW Type 2.
Who operates Mains Farm Wigwams?
Mains Farm Wigwams is on the Zero Carbon World network. For site issues, the operator lists 01786850735.
Can anyone charge at Mains Farm Wigwams (Zero Carbon World)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Mains Farm Wigwams (Zero Carbon World)?
Station Road Car Park (Chargeplace Scotland) is 5.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Mains Farm Wigwams (Zero Carbon World)?
A 10–80% charge takes about 18h 26m on the 3 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mains Farm Wigwams (Zero Carbon World)?
A 10–80% charge takes about 13h 18m on the 3 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mains Farm Wigwams (Zero Carbon World)?
A 10–80% charge takes about 17h 2m on the 3 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- The Woodhouse Kippen · 7 kW · 2.6 mi