Zero Carbon World · EV charging site
Martin's Haven National Trust car park
Marloes Peninsula, Dale, SA62 3BJ
Martin's Haven National Trust car park is an EV charging site in Dale, Pembrokeshire, run by Zero Carbon World. It has a single 7 kW Type 2 socket. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Ffordd Angor / Anchor Drive (Dragon Charging), 10.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Martin's Haven National Trust car park (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does Martin's Haven National Trust car park (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Martin's Haven National Trust car park?
Martin's Haven National Trust car park is on the Zero Carbon World network.
Where is the nearest charger with 50 kW or more to Martin's Haven National Trust car park (Zero Carbon World)?
Ffordd Angor / Anchor Drive (Dragon Charging) is 10.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Martin's Haven National Trust car park (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Martin's Haven National Trust car park (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Martin's Haven National Trust car park (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.