Zero Carbon World · EV charging site
Nantyffin Cider Mill
Brecon Road, Ebbw Vale, NP8 1SG
Nantyffin Cider Mill is an EV charging site in Ebbw Vale, Blaenau Gwent, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Beaufort Street Car Park (Evolt), 1.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01873 810775
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Nantyffin Cider Mill (Zero Carbon World)?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.
How many charging sockets does Nantyffin Cider Mill (Zero Carbon World) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.
Who operates Nantyffin Cider Mill?
Nantyffin Cider Mill is on the Zero Carbon World network. For site issues, the operator lists 01873 810775.
Where is the nearest charger with 50 kW or more to Nantyffin Cider Mill (Zero Carbon World)?
Beaufort Street Car Park (Evolt) is 1.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Nantyffin Cider Mill (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nantyffin Cider Mill (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nantyffin Cider Mill (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Manor
- Dragon Inn (Crickhowell) Ltd
- Beaufort Street Car Park
- Wern Watkin Bunkhouse
- The Hall Farm
- Main Road, Abergavenny
- Fastest nearby
- Beaufort Street Car Park · 50 kW · 1.7 mi