# National Star · Zero Carbon World

Web page: https://ampmap.co.uk/charger/zero-carbon-world-national-star-uk

National Star is an EV charging site in Cheltenham, Gloucestershire, run by Zero Carbon World. It has a single 7 kW Type 2 socket, and the price is listed as Free for visitors to the centre only.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Ullenwood Manor Road,, GL53 9QU
- **Area:** Cheltenham, Gloucestershire, United Kingdom
- **Coordinates (latitude, longitude):** 51.84940, -2.08424

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |

- **Price:** Free for visitors to the centre only (from Open Charge Map)

## Site information

- **Operator:** Zero Carbon World
- **Opening hours:** Not published
- **Access:** Customers only

## Common questions

### How much does it cost to charge at National Star (Zero Carbon World)?

The listed price is Free for visitors to the centre only. Prices can change, so check the price at the charger before you start.

### How fast is charging at National Star (Zero Carbon World)?

Up to 7 kW AC via Type 2.

### How many charging sockets does National Star (Zero Carbon World) have?

1 charging socket: 1 × 7 kW Type 2.

### Who operates National Star?

National Star is on the Zero Carbon World network. For site issues, the operator lists 01242 527631.

### Can anyone charge at National Star (Zero Carbon World)?

The operator lists this charger for customers of the site.

### How long does a Tesla Model Y Long Range take to charge at National Star (Zero Carbon World)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at National Star (Zero Carbon World)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at National Star (Zero Carbon World)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Cheltenham](https://ampmap.co.uk/chargers/united-kingdom/gloucestershire/cheltenham)
- [Zero Carbon World chargers](https://ampmap.co.uk/networks/zero-carbon-world)

## Chargers near this site

- [The Greenway Hotel and Spa, Cheltenham ( Eden Hotels) · Go Zero](https://ampmap.co.uk/charger/go-zero-the-greenway-hotel-and-spa-cheltenham-eden-hotels-uk) - Type 2 22 kW · The Greenway Hotel and Spa
- [Cowley Manor](https://ampmap.co.uk/charger/monta-aps-cowley-manor-bay-1-new-uk) - Type 2 22 kW · Cowley Manor Experimental
- [Clock Tower, Cheltenham · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-the-clock-tower-uk) - CCS 50 kW, CHAdeMO 50 kW · Charlton Kings · From 89p/kWh
- [Primrose Vale Farm Shop, Bentham · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-primrose-vale-farm-shop-uk) - CCS 150 kW, CHAdeMO 50 kW · Shurdington Road · From 89p/kWh
- [Morrisons · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-4-uk) - CHAdeMO 50 kW, Type 2 50 kW · Morrisons Caernarvon Rd
- [Premier inn Gloucester (Little Witcombe) · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-premier-inn-gloucester-little-witcombe-uk) - CCS 60 kW, CHAdeMO 60 kW · Little Witcombe

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/zero-carbon-world-national-star-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 30 Jul 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
