Zero Carbon World · EV charging site
National Trust Car Park Porthor / Whistling Sands
Fferm Carreg, Nefyn, LL53 8LH
National Trust Car Park Porthor / Whistling Sands is an EV charging site in Nefyn, Gwynedd, run by Zero Carbon World. It has a single 7 kW Type 2 socket. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Abersoch Garden Centre, 9.7 miles away.
Status
Temporarily closed
Listed as temporarily closed. Check before you travel.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01758 780219
- Notes
- Not in working order - July 2025
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at National Trust Car Park Porthor / Whistling Sands (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does National Trust Car Park Porthor / Whistling Sands (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates National Trust Car Park Porthor / Whistling Sands?
National Trust Car Park Porthor / Whistling Sands is on the Zero Carbon World network. For site issues, the operator lists 01758 780219.
Where is the nearest charger with 50 kW or more to National Trust Car Park Porthor / Whistling Sands (Zero Carbon World)?
Abersoch Garden Centre is 9.7 miles away in a straight line, with up to 80 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at National Trust Car Park Porthor / Whistling Sands (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at National Trust Car Park Porthor / Whistling Sands (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at National Trust Car Park Porthor / Whistling Sands (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.