Zero Carbon World · EV charging site
National Trust Plas yn Rhiw
National Trust Plas yn Rhiw Car Park, Nefyn, LL53 8AF
National Trust Plas yn Rhiw is an EV charging site in Nefyn, Gwynedd, run by Zero Carbon World. It has a single 7 kW Type 2 socket. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Abersoch Garden Centre, 5.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01690713317
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at National Trust Plas yn Rhiw (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does National Trust Plas yn Rhiw (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates National Trust Plas yn Rhiw?
National Trust Plas yn Rhiw is on the Zero Carbon World network. For site issues, the operator lists 01690713317.
Where is the nearest charger with 50 kW or more to National Trust Plas yn Rhiw (Zero Carbon World)?
Abersoch Garden Centre is 5.4 miles away in a straight line, with up to 80 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at National Trust Plas yn Rhiw (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at National Trust Plas yn Rhiw (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at National Trust Plas yn Rhiw (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.