Zero Carbon World · EV charging site
Next to CO-OP
140 Leek Road, Biddulph, ST9 9EW
Next to CO-OP is an EV charging site in Biddulph, Staffordshire, run by Zero Carbon World. It has a single 7 kW Type 2 socket, and the price is listed as Donation to cover electricity costs. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Holdcroft Nissan (Nissan UK Dealer Network), 3.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Price
- Donation to cover electricity costs(from Open Charge Map, 4 May 2018)
- Getting there
- Charging availability Mon to Fri 08.30 to 18.00, Sat 09.00 to 16.00, Sun 10.00 to 16.00 PLEASE EMAIL AHEAD TO REQUEST USE OF CHARGING STATION
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Next to CO-OP (Zero Carbon World)?
The listed price is Donation to cover electricity costs. Prices can change, so check the price at the charger before you start.
How fast is charging at Next to CO-OP (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does Next to CO-OP (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Next to CO-OP?
Next to CO-OP is on the Zero Carbon World network.
Where is the nearest charger with 50 kW or more to Next to CO-OP (Zero Carbon World)?
Holdcroft Nissan (Nissan UK Dealer Network) is 3.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Next to CO-OP (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Next to CO-OP (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Next to CO-OP (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Westfields
- Sov - Type 2 - Charger 2
- Pod Point Nissan Holdcroft Stoke-On-Trent
- Holdcroft Nissan Stoke-On-Trent
- Holdcroft Nissan
- intu Potteries Shopping Centre Car Park 2
- Cheapest nearby
- Pod Point Nissan Holdcroft Stoke-On-Trent · Free · 7 kW · 3.5 mi
- Fastest nearby
- Holdcroft Nissan · 50 kW · 3.6 mi