# Next to CO-OP · Zero Carbon World

Web page: https://ampmap.co.uk/charger/zero-carbon-world-next-to-co-op-uk

Next to CO-OP is an EV charging site in Biddulph, Staffordshire, run by Zero Carbon World. It has a single 7 kW Type 2 socket, and the price is listed as Donation to cover electricity costs.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 140 Leek Road, ST9 9EW
- **Area:** Biddulph, Staffordshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.07072, -2.11710
- **Getting there:** Charging availability Mon to Fri 08.30 to 18.00, Sat 09.00 to 16.00, Sun 10.00 to 16.00 PLEASE EMAIL AHEAD TO REQUEST USE OF CHARGING STATION

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |

- **Price:** Donation to cover electricity costs (from Open Charge Map)

## Site information

- **Operator:** Zero Carbon World
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at Next to CO-OP (Zero Carbon World)?

The listed price is Donation to cover electricity costs. Prices can change, so check the price at the charger before you start.

### How fast is charging at Next to CO-OP (Zero Carbon World)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Next to CO-OP (Zero Carbon World) have?

1 charging socket: 1 × 7 kW Type 2.

### Who operates Next to CO-OP?

Next to CO-OP is on the Zero Carbon World network.

### How long does a Tesla Model Y Long Range take to charge at Next to CO-OP (Zero Carbon World)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Next to CO-OP (Zero Carbon World)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Next to CO-OP (Zero Carbon World)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Biddulph](https://ampmap.co.uk/chargers/united-kingdom/staffordshire/biddulph)
- [Zero Carbon World chargers](https://ampmap.co.uk/networks/zero-carbon-world)

## Chargers near this site

- [Westfields · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-westfields-uk) - Type 2 7 kW · Clay Lake
- [Sov - Type 2 - Charger 2](https://ampmap.co.uk/charger/sov-type-2-charger-2-uk) - Type 2 22 kW · Brown Lees Ind Est,
- [Pod Point Nissan Holdcroft Stoke-On-Trent](https://ampmap.co.uk/charger/pod-point-nissan-holdcroft-stoke-on-trent-uk) - Type 2 7 kW · Leek Road Hanley, Stoke-on-Trent · Free to use
- [Holdcroft Nissan Stoke-On-Trent · Nissan UK Dealer Network](https://ampmap.co.uk/charger/nissan-uk-dealer-network-holdcroft-nissan-stoke-on-trent-uk) - Type 2 7 kW · Leek Road
- [Holdcroft Nissan · Nissan UK Dealer Network](https://ampmap.co.uk/charger/nissan-uk-dealer-network-holdcroft-nissan-uk) - CHAdeMO 50 kW · Leek Road
- [intu Potteries Shopping Centre Car Park 2 · Blink Charging](https://ampmap.co.uk/charger/blink-charging-intu-potteries-shopping-centre-car-park-2-uk) - Type 2 7 kW · Quadrant Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/zero-carbon-world-next-to-co-op-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 4 May 2018).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
