# Pembroke Dock Ferry Terminal · Zero Carbon World

Web page: https://ampmap.co.uk/charger/zero-carbon-world-pembroke-dock-ferry-terminal-uk

Pembroke Dock Ferry Terminal is an EV charging site in Pembroke Dock, Pembrokeshire, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Irish Ferries Ltd, SA72 6UF
- **Area:** Pembroke Dock, Pembrokeshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.69641, -4.95205

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 1 | Not listed |

## Site information

- **Operator:** Zero Carbon World
- **Opening hours:** Not published
- **Access:** Customers only
- **Notes:** 13A is accessible to the public 7kW currently is only accessible to the Ferry staff - investigating moving the charging station.

## Common questions

### How fast is charging at Pembroke Dock Ferry Terminal (Zero Carbon World)?

Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.

### How many charging sockets does Pembroke Dock Ferry Terminal (Zero Carbon World) have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.

### Who operates Pembroke Dock Ferry Terminal?

Pembroke Dock Ferry Terminal is on the Zero Carbon World network. For site issues, the operator lists 08717 300 500.

### Can anyone charge at Pembroke Dock Ferry Terminal (Zero Carbon World)?

The operator lists this charger for customers of the site.

### How long does a Tesla Model Y Long Range take to charge at Pembroke Dock Ferry Terminal (Zero Carbon World)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pembroke Dock Ferry Terminal (Zero Carbon World)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Pembroke Dock Ferry Terminal (Zero Carbon World)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Pembroke Dock](https://ampmap.co.uk/chargers/united-kingdom/pembrokeshire/pembroke-dock)
- [Zero Carbon World chargers](https://ampmap.co.uk/networks/zero-carbon-world)

## Chargers near this site

- [Y Cerrig Glas, Pembroke Dock · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-y-cerrig-glas-uk) - CCS 60 kW, CHAdeMO 50 kW · 42 Front Street · From 89p/kWh
- [Western Way Car Park, Pembroke Dock · Silverstone Green Energy](https://ampmap.co.uk/charger/silverstone-green-energy-western-way-car-park-pembroke-dock-uk) - Type 2 120 kW · Western Way
- [Gordon Street Car Park · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-gordon-street-car-park-uk) - Type 2 22 kW · Gordon Street
- [Llanion Park H.Q - Front, Pembroke Dock · Silverstone Green Energy](https://ampmap.co.uk/charger/silverstone-green-energy-llanion-park-h-q-front-pembroke-dock-uk) - CHAdeMO 50 kW, Type 2 50 kW · Llanion Park
- [Pod Point Tesco Superstore - Pembroke Dock](https://ampmap.co.uk/charger/pod-point-tesco-superstore-pembroke-dock-2-uk) - CCS / CHAdeMO 50 kW, Type 2 22 kW · London Road Bierspool · From 44.4p/kWh
- [High Street Car Park, Neyland · Silverstone Green Energy](https://ampmap.co.uk/charger/silverstone-green-energy-high-street-car-park-neyland-uk) - Type 2 22 kW · High Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/zero-carbon-world-pembroke-dock-ferry-terminal-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 6 Jul 2016).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
