Zero Carbon World · EV charging site
Pickersgill Manor Farm Bed and Breakfast
Low Lane, Keighley, BD20 9JH
Pickersgill Manor Farm Bed and Breakfast is an EV charging site in Keighley, Bradford, run by Zero Carbon World. It has a single 7 kW Type 2 socket. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Bridge Street Car Park (GeniePoint), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01535655228
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Pickersgill Manor Farm Bed and Breakfast (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does Pickersgill Manor Farm Bed and Breakfast (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Pickersgill Manor Farm Bed and Breakfast?
Pickersgill Manor Farm Bed and Breakfast is on the Zero Carbon World network. For site issues, the operator lists 01535655228.
Where is the nearest charger with 50 kW or more to Pickersgill Manor Farm Bed and Breakfast (Zero Carbon World)?
Bridge Street Car Park (GeniePoint) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pickersgill Manor Farm Bed and Breakfast (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pickersgill Manor Farm Bed and Breakfast (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pickersgill Manor Farm Bed and Breakfast (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Bridge Street Car Park
- Wesley Place Car Park 3
- Mill Lane 1
- Airedale Hospital
- Pod Point Milligan’s Field Car Park
- Bolton Rd Car Park 1
- Cheapest nearby
- Pod Point Milligan’s Field Car Park · 39.6p per kWh · 7 kW · 2.6 mi
- Fastest nearby
- Bridge Street Car Park · 50 kW · 1 mi