Zero Carbon World · EV charging site
Queens Head Inn
Kettlesing, Harrogate, HG3 2LB
Queens Head Inn is an EV charging site in Harrogate, North Yorkshire, run by Zero Carbon World. It has a single socket, with Type 2 at up to 22 kW. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Tesco Express, Killinghall (Osprey Charging), 3.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01423 770263
- Getting there
- Also on site: 2 Tesla-specific tethered destination chargers.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Queens Head Inn (Zero Carbon World)?
Up to 22 kW AC via Type 2.
How many charging sockets does Queens Head Inn (Zero Carbon World) have?
1 charging socket: 1 × 22 kW Type 2, 1 × 7 kW Type 2.
Who operates Queens Head Inn?
Queens Head Inn is on the Zero Carbon World network. For site issues, the operator lists 01423 770263.
Where is the nearest charger with 50 kW or more to Queens Head Inn (Zero Carbon World)?
Tesco Express, Killinghall (Osprey Charging) is 3.8 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Queens Head Inn (Zero Carbon World)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Queens Head Inn (Zero Carbon World)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Queens Head Inn (Zero Carbon World)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.