# Rest and Be Thankful Inn · Zero Carbon World

Web page: https://ampmap.co.uk/charger/zero-carbon-world-rest-and-be-thankful-inn-uk

Rest and Be Thankful Inn is an EV charging site in Minehead, Somerset, run by Zero Carbon World. Both of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Wheddon Cross, TA24 7DR
- **Area:** Minehead, Somerset, United Kingdom
- **Coordinates (latitude, longitude):** 51.13872, -3.54066

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Zero Carbon World
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at Rest and Be Thankful Inn (Zero Carbon World)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Rest and Be Thankful Inn (Zero Carbon World)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Rest and Be Thankful Inn (Zero Carbon World) have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.

### Who operates Rest and Be Thankful Inn?

Rest and Be Thankful Inn is on the Zero Carbon World network. For site issues, the operator lists 01643 841222.

### How long does a Tesla Model Y Long Range take to charge at Rest and Be Thankful Inn (Zero Carbon World)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rest and Be Thankful Inn (Zero Carbon World)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Rest and Be Thankful Inn (Zero Carbon World)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Minehead](https://ampmap.co.uk/chargers/united-kingdom/somerset/minehead)
- [Zero Carbon World chargers](https://ampmap.co.uk/networks/zero-carbon-world)

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/zero-carbon-world-rest-and-be-thankful-inn-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 30 Apr 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
